How the litigation system works, and how every part fits together
One matter, handled as one strategy with several recipients. Evidence sits in a typed store, instruments are written in a vault, a ladder and a gate test the work, runs and subagents do the heavy lifting, an independent review audits the lot, and only Tom King signs and sends.
c3955ae · 5 Oct 2026 20:55 +0200
Page generated 6 Oct 2026 15:43 CEST (13:43 UTC)
Not counsel-reviewed · Inward · Not for dispatch
Built from the review project files at that commit, not the live store
Five layers and one human gate
The system is easiest to understand as a pipeline that records facts, turns them into documents, tests the documents, and then stops at a person. A second, independent loop (the Review Project) reads everything without changing it and reports what the pipeline cannot see about itself.
The four ideas that make it work
The matter is not Ian Wolter alone. It covers Andrew Hobsbawm, Heather Salway, William Nicholl, the shareholders, Crowdcube and the wider legal strategy, and every review treats it as one whole so that letters cannot contradict one another.
A filename, a register description or a status cell can all be wrong. Where a finding turns on what a document says, the primary is opened and quoted. This rule exists because of real errors (E-620, E-065, E-084).
Every decision is a numbered D-row. Later work cites it, cannot silently override it, and may only record a "CHALLENGE TO D-xxx" with reasons. Landing markers then test whether a decision actually appears in the documents.
A signature means "I approve this exact text, sha256 …". If the text changes, the hash changes and the approval no longer applies. Only Tom King signs and only Tom King sends.
What the system is protecting: one claim, ten review lanes
CloudWorkz Limited has pre-action claims against its former directors. Tom King is the only founder and, since February 2024, the sole active director. Each lane below has its own instruments, evidence set and review folder. Pick a lane to see its role and state.
Who the recipients are
| Person | Role in the matter | Pack | Posture |
|---|---|---|---|
| Ian Wolter | Executive Chairman, principal target; resigned as director 8 Feb 2024 | PACK-1 | Core letter before claim, 21 days to respond, 7 to acknowledge, plus schedules and the Deed of No Personal Benefit |
| Andrew Hobsbawm | Former non-executive director | PACK-2 | Lane currently marked DO NOT SEND; only Tom King can release it (D-614) |
| Heather Salway | Former director; Ian Wolter's sister | PACK-3 | Letter must state claim and relief sought (decided 2 Sep), 14 days |
| William Nicholl | Former director | PACK-4 | 14 days; invoices reconcile to £26,448.12 |
| Shareholders, Crowdcube | Deed outreach, buy-back facilitation, members' report | PACK-5/6/7 | Deed names no one and states no figure; Crowdcube asked to invite every underlying investor to sign or give reasons |
One home for each kind of thing
Documents live in the vault, the typed record lives in the matter store inside the same vault folder, and the primary originals never leave the LaCie drive and the mailbox exports. The rule since 6 September (D-262) is that everything sits in one location, with only markdown going to Obsidian.
| What | Where | Role | Write rule |
|---|---|---|---|
| Matter store (Wolter) | Litigation/Lexi-Matters/cloudworkz-v-wolter | evidence.sqlite, exhibits.yaml, DECISION-LOG, FINDINGS-LEDGER, acceptance/*.yaml, tools/, HANDOVER, CLAUDE.md | Working record; writers gated by read receipt (RULE 1B) |
| Hobsbawm store | Lexi-Matters/cloudworkz-v-hobsbawm | Separate register for the Hobsbawm lane | Disagrees with the Wolter store on some facts; 41 of 62 exhibit ids collide |
| V9 instruments | Litigation/Wolter/V9-source | The 69 canonical instruments (letters, schedules, deeds, RFIs, scripts) and their sidecars | Single authoring and approval surface since 31 Aug; generator pipeline retired until sign-off |
| Primary evidence | /Volumes/LaCie/Litigation-Cloudworkz-v-Wolter | Mail exports (about 30 GB for Tom King's mailbox), bank statements, certificates, Google Takeout, 74,595 files, 262 GB | Read-only. Binaries never go into Obsidian |
| Backups | LaCie Mac-cleanup-2026-10-04/ | About 2,500 .bak and pre-image files moved off the Mac by Tom King's own cleanup | The LaCie copy is currently the only copy |
| Review Project | CloudWorkz-Review-Project/ | The independent audit, its findings and the human-review folders | Writes only here; matter and LaCie are read-only |
| Advisor master document | wolter-advisor-review/ | 29 July compiled export for an outside reader, seven sections | Snapshot, now superseded by later work |
The Lexi engine behind the store
Lexi is Tom King's own tool for assembling structured litigation packs. All privileged matter content stays on his machine and is never written to the code repository or the cloud database, which is schema-restricted to login and billing. The legal-discipline rules live in one Python engine and are called through a defined interface, not re-implemented in the web layer.
- The engine exposes named operations: validate a bundle, run discipline checks, build a manifest, assemble a pack, a cold-read pass for human review, dispatch, an audit trail and a final acceptance gate reduced to one yes/no against eight criteria.
- Fail-closed: if an AI step fails or is flagged, the system stops, falls back to a deterministic path and flags a human. Raw AI output never lands in a legal document without a human review step.
- Check-sync compares the hand-kept exhibit register with the database and refuses to overwrite the register when the database looks unpopulated, so a naive "--fix" cannot wipe hundreds of exhibits.
- Of the July advisor snapshot: the test suite collected 603 tests against a stated 574, a small example of a governing document going stale.
From a file on the LaCie to a quoted exhibit in a letter
Every statement in an outward instrument has to trace back to a held primary. The evidence layer is the chain that makes that checkable.
What the layer guarantees
- All 2,080 held primaries resolve with a full sha256 match at the 4 Oct baseline; 1,108 of 1,114 exhibits are held.
- Of 203 exhibits cited by the Wolter letter, all are held; 151 spans were tested and 150 were verbatim, 1 partial, 0 contradicted.
- Quotations are tested mechanically; registers are never accepted as proof of what a document says.
- Receipt tables record who registered, retagged or corrected what, and when.
What it cannot yet guarantee
- 37 of 1,114 exhibits point at a different document than the latest registration receipt; 13 are cited and six are genuinely wrong (E-020, E-027, E-039, E-244, E-296, E-547).
- Register prose reached outward text three times (E-620, E-065, E-084).
- No litigation hold exists on any Company system, and the Wolter Takeout of June 2026 has thin custody records.
- 130 cited exhibits have no LaCie path; of 477 that do, 102 do not byte-match (46 cited outward, mostly renderings).
Every choice is a numbered row, and later work has to respect it
The decision log is the memory of what Tom King has decided. It is what stops a new session from reopening settled questions, and what lets an auditor say whether a letter reflects the decisions in force.
690 rows (D-001 to D-693, with two undocumented gaps at D-515 and D-519). The canonical log is the one in the live matter store; the earlier vault fork collided on D-numbers and was retired (2 Sep).
About 1,705 F-rows: defects found, their status and owner. Of 485 rows tagged open or for-Tom, 116 are stale and 131 are already answered, so only about 30 are real judgements.
A settled-questions index and a ranking of which document controls when two disagree (Tier 0 key rules, canonical strategies, decision rows, then registers). Held in the Wolter parent folder, which has no git copy.
Landing markers: turning a decision into a test
A marker says "this phrase must be present (or absent) in this file". The decision-landing check reads the markers. Where a marker existed, the review found the decision in place; where none existed, it found four decisions missing or reversed.
How one document travels from draft to sent
An instrument is any document that leaves the building or binds someone: a letter before claim, an RFI, a deed, a members' update, a video script. Each has a code in the document index, a sidecar, a chain of dependants and an approval state. Step through the lifecycle below.
The five approval controls
Five separate controls assert that an instrument is ready. They overlap, and only some are tests rather than statements.
| Control | What it asserts | Type | Verdict of the review |
|---|---|---|---|
| Sign-off sheet | 27 lines: read, conformity, exact-copy approval (line 24) | Prose | Keep Line 24 should carry the freeze hash |
| D-190 alignment block | Decisions implemented, evidence rested on, gates and conduct limbs | Prose | Simplify Generate a current-state line; prose goes stale |
| Freeze (signoff.py) | sha256 of approved bytes; a break travels down the document chain | Test | Keep and extend Only 1 of 53 frozen |
| Read receipt | Four controlling documents declared read before a register write | Test (4 writers) | Keep Add a gate row and version hash |
| Landing markers | A phrase present or absent in a named file | Test | Keep, extend coverage Caught live defects |
| Alignment protocol, pre-reliance checklist | Five-step and eleven-dimension passes | Prose | Retire Never run on any send |
How work is actually executed, session after session
The matter is too large for one conversation, so the system is built around handovers, recorded runs and parallel workers. Three kinds of run exist.
The shape of a worker wave
The two machines that test the work
The ladder asks whether each layer of the matter (rules, decisions, evidence, claims, strategy and so on) has been assessed against the current bytes of its inputs. The gate runs 67 mechanical checks across the instruments and registers. Both were audited on 5 October.
What the review found, at commit c3955ae
Computed from 01-FINDINGS.csv (461 rows) on 6 October. The ladder and gate figures further down come from the framework review and were not re-derived in this update.
| Findings by recipient | Rows | Findings by recipient | Rows |
|---|---|---|---|
| Wolter | 97 | Members | 45 |
| All recipients | 84 | Salway | 39 |
| RFIs | 67 | Nicholl | 38 |
| Hobsbawm | 47 | Settlement, Crowdcube | 22 each |
The 15-rung ladder
A rung's verdict is typed by a session into layers.yaml. The code can only downgrade it: to COUNTERFEIT if a check fails, or to STALE if the sha256 of the declared inputs has changed. Hashing is by content since D-428.
| # | Rung | What its checks test | At HEAD | Review verdict |
|---|
gates, has no inputs and no checks, so its hash is the hash of nothing and it can never be anything but satisfied.The 67-check gate
Two judges exist: gate_runner.py records a run and preservice_gate.py (PG) decides what a result means. They disagree. On a fresh full run PG blocked on 10 checks while the handover said "3 non-zero" and a decision row said the gate was clean except for Tom King's items.
| # | Check | Verdict | Why, and the smallest fix |
|---|
Dispatch readiness: what nothing yet measures
The review's central finding about the machinery is that it reports on itself, not on what will leave the building. It proposes one joining check, check_dispatch_ready.py, with seven tests. The matrix shows each pack against them as of 5 October.
- a Frozen with a masked hash
- b Review PDF text is clean (no placeholders, no inward banners)
- c PDF is complete (every enclosed schedule present)
- d Dispatch manifest row matches current source
- e Day-of checklist cleared, with who and when
- f Sidecars, markers and quotations clean for that file
- g Enclosure bundle exists and matches the held primaries
Both went round the release path. The direct-investor email was sent with nine edits made after the session's last version (D-546), and the deed review copy was recorded five days after it was sent (D-681). The as-sent intake proposed by the review would hash whatever Tom King actually sends.
| Pack or lane | a Frozen | b/c PDF | e Placeholders | f Sidecar, markers | g Enclosures | Blocking | State |
|---|---|---|---|---|---|---|---|
| PACK-1 Ian Wolter | Fail | Fail | Fail | Part | Fail | 8 | Not ready |
| PACK-2 Andrew Hobsbawm | Fail | Pass | Part | Part | Fail | 12 | Not ready; DO NOT SEND under D-614 |
| PACK-3 Heather Salway | Fail | Pass | Part | Part | Fail | 11 | Not ready |
| PACK-4 William Nicholl | Fail | Pass | Part | Part | Fail | 8 | Not ready |
| RFIs (13 + SJP) | Fail | Pass | Part | Part | Fail | 21 | Not ready |
| Crowdcube | Fail | Fail | n/a | Part | Fail | 13 | Not ready; D-317 sign-off not obtained |
| Members update | Fail | Part | Fail | Part | n/a | 6 | Not ready; follows Crowdcube |
| Video 1 | Fail | Fail | n/a | Fail | n/a | 5 | Not ready; cannot record against a deed version that does not exist |
| Settlement deeds | Fail | Fail | Part | n/a | n/a | 13 | Not ready; later stage by design |
| DocuSign signing version | None | n/a | n/a | None | n/a | 1+ | Does not exist as an instrument yet |
| Direct-investor email (DIE) | Frozen | n/a | n/a | n/a | n/a | 0 | Sent 14 September; the only frozen instrument |
Failing test (a) is expected while drafting continues: the ordering rule (D-557) says anything that will still move must move before anything is frozen. The defect is that nothing shows the other six tests.
The Review Project: read everything, change nothing, prove it
On 4 October Tom King commissioned a complete review of the whole matter (brief v6). It ran as a separate project folder with hard rules: the matter folders and LaCie are read-only, nothing is sent or uploaded, only Tom King sends, and questions never stop the run but go to a questions file.
Three goals, in order
Every document, decision, evidence item, open item and reason is found, indexed and carried forward. 17,042 files were indexed; 91,637 coverage rows record what was read in full, in part or not at all.
A cover note, unchanged text with hash, redlines, evidence table, enclosure review, consistency check and sign-off page for every instrument.
Framework, systems, evidence, logic, claims, causation, quantum, law, strategy and conduct risk, handed back as numbered files 00 to 99.
The six phases
| Phase | Content | Status |
|---|---|---|
| 0 | Set up the project, prove access (PASS 25, WARN 5, FAIL 0), freeze git baselines and a sha256 manifest of 17,042 files | Done 4 Oct |
| 1 | Eight project skills: matter orientation, evidence verification, instrument review, claims/causation/quantum, law check, conduct gate, enclosure test, context keeper (v0, then v1 with changelogs) | Done 5 Oct |
| 2 | Nothing lost: master index, context map, decisions map (690 rows), open items (142), orphans and risks (270 rows) | Done 5 Oct |
| 3 | Subagent reviews by pack, area and lane; two red teams; law checked online; Companies House; adversarial verification | Done 5 Oct |
| 4 | human-review/: one folder per instrument across ten lanes, reading order, questions, evidence bundle index, chronology, PDFs | Done 5 Oct |
| 5 | Handback: executive summary, findings CSV, scorecard, claims/causation/quantum, strategy, red teams, framework, enhancements, enclosures, coverage, integrity | Done 5 Oct |
What the audit found
126 are marked dispatch-blocking. Types: defects, gaps, redundancies, enhancements and challenges to recorded decisions.
Every row carries an id, type, severity, confidence (VERIFIED against the primary, PART, or INFERRED), recipient, file and line, a quoted piece of evidence, why it matters, the smallest fix and its owner, the decision affected and whether it blocks dispatch.
Independent checks on the audit itself
Every critical finding and every challenge to a decision went through a sceptic pass: 48 survived, none refuted. Severity was corrected where needed (for example the 35-page PDF finding went from critical to high).
Two teams worked only from what each recipient would hold: one as Ian Wolter (25 findings, including enclosed warnings that turn into a threat against Tom King), one as the non-executive directors (17 findings, including the unpaid £2,341.97 judgment and Tom King's own 11 February 2024 email to William Nicholl).
Tom King asked whether every question put to him was genuinely unanswered. Four sonnet agents checked each against the decision log, ledger, settled facts and his chat answers. Result: most were partly or wholly answered already, so the punch list asks only what is still open (69 questions: 49 before dispatch, 20 can follow) and lists 13 as already answered.
A sha256 manifest before and after shows 0 files added to or modified in the matter by the review. 130 baseline paths absent from the Mac were Tom King's own cleanup, all .bak pre-images, all present on the LaCie (25 of 25 re-hashed matched).
ARTICLES-CROSSWALK-2022-v-2023.md), 13 root files were corrected, and the cover note, sign-off, consistency and evidence table of every human-review instrument now open with the line "Articles correction 5 Oct 2026". The lesson recorded: non-filing at Companies House does not show non-adoption, and when a primary has several dated versions, read all before reporting the operative one. See section 12.Scorecard of the control framework
| Component | Met | Partly | Not met | Comment |
|---|---|---|---|---|
| Rungs (15) | 0 | 6 | 9 | Strongest: evidence and assertions. Weakest: gates, plan, loss, merits |
| Gate checks (67) | 5 | 49 | 13 | 12 checks cannot exit non-zero; 4 do not measure their names |
| CLAUDE.md rules | 2 | 9 | 10 | Rules claim "mechanical" where only four writers are gated |
| Skills and skill rules (SR-01 to SR-05) | All partly met; two retire as duplicates, two need an owner decision | No skill receipt exists for the 3 and 4 Oct sessions | ||
Where the machinery hands over to Tom King
The review does not decide anything. It prepares each instrument so that Tom King can approve, change or hold it in his own time, and it prepares his answers so that dictation is enough.
COVER-NOTE.mdwhat it is, to whom, the decisions behind it, the evidence described in plain terms, strengths and weaknesses, and numbered decisions for TomCURRENT-TEXT.mdthe V9 text copied unchanged; line 1 is its sha256 so exactness can be checkedPROPOSED-CHANGES.mdeach change as OLD to NEW with reason; reversals of recorded decisions kept apart as challengesEVIDENCE-TABLE.mdeach statement, the primary's quote and a status of VERIFIED, PART, INFERRED or CONTRADICTEDENCLOSURE-REVIEW.mdkeep, remove, add or redact per enclosureCONSISTENCY.mdagainst its chain, sibling letters, decisions and deedsSIGN-OFF.mdthe unsigned exact-copy approval block
- READING-ORDER order 05, 01, 03, 04, 02, 06, 07, 08, 09 with time estimates (the Wolter folder alone is about 5.5 hours of deciding and 3.7 hours of exact-copy reading)
- PUNCH-LIST numbered, voice-readable questions with lettered options and a default; 49 before dispatch, 20 can follow, 2 for counsel, 5 answered by Tom on 5 October, 13 already answered by earlier decisions (not asked), 8 that are Claude's own work. A phone PDF is at
human-review/pdf/A3-PUNCH-LIST.pdf - QUESTIONS-FOR-TOM the full protocol version, each item with a "Checked" line
- HANDOVER-FOR-HUMANS the matter on one page, recipient by recipient, and how to resume
- EVIDENCE-BUNDLE-INDEX 320 cited exhibits and what each enclosure set would contain
- CHRONOLOGY 97 rows by function, not by filing date
- pdf/ 72 phone-readable PDFs, re-rendered after the Articles correction
Start here: fifteen genuinely unanswered items
The punch list's own "start here" list (as at commit c3955ae). Everything else in Section 1 is only partly open: the earlier decision stands unless Tom says otherwise.
Tom's order of work: the start-here items, then Section 1, then Section 2. His answers are recorded as D-rows by him; the review does not write to the matter. Four review defaults run against Tom's own earlier decisions and are flagged as challenges, not applied: D2 (D-681), D4 (D-656/657), E4 (D-205, D-673) and G1 (D-232, D-268, D-287).
What now stands between the drafts and dispatch
This replaces the earlier plan on one point. "Appoint a second director and pass a members' resolution" is no longer a pre-dispatch step. The April 2023 Articles allow one director and make one quorate, and Tom has decided not to appoint a second (Claudia Chavez was rejected: not independent, and a second director would raise the quorum to two). Everything below depends on those Articles having been adopted, which Tom confirmed in chat on 5 October. The signed pack has not been seen by the review.
ARTICLES-RECITATION-INDEX.md (41 sentences re-checked so far, 9 of them now wrong).10-CORPORATE-CAPACITY are usable as drafts. The written resolution (draft 01) is a fallback only.Counsel questions, decided meanwhile by Tom
- Whether Tom may vote his shares to authorise his own interest (Art 28.1(h)). The general-law point: s.239 excludes the interested member from ratification, not from prior authorisation, but there is a s.994 unfair-prejudice risk.
- The late Companies House filing (no RES01 in 2023): an offence by the Company and its officers, but it does not make the resolution ineffective (ss.26, 29 to 30).
- Wolter's Art 25.1(b) right to reappoint himself and its effect on quorum.
- The 55% drag-along threshold (it was 75% in 2022) and the changed transfer and co-sale rules (AR-004, AR-005).
Open: not to be marked done
| Item | Why it is open | Status |
|---|---|---|
| Signed SeedLegals pack | Tom confirms signing in April 2023; the review has not seen the signed pack | Open |
| Signed No-Benefit Deed | The review copy is unsigned; no date or witness | Open |
| Companies House filing | No RES01 or new Articles filed in 2023 (history read in full 4 Oct, re-checked 5 Oct) | Open |
| Which April text was adopted | 6 April or 26 April 2023; the provisions Tom needs are identical, the numbering differs by one article | Open |
| D-285 | Not re-read | Open |
| Calderbank expiry (13 Nov) | Not re-checked beyond D-206(5) | Open |
Also still open on the register: the register of members at adoption and whether the special resolution reached 75% of eligible votes (not checked). Separately, the LaCie archives of the 2,509 backup files Tom moved off the Mac on 4 to 5 October are now the only copy; a second copy is still to be made.
The Articles correction, the superseded references, and Tom's recorded answers
2022 against 2023
| Point | 2022 Articles (26 Jan 2022) | April 2023 Articles | Effect |
|---|---|---|---|
| Number of directors | Art 23: not less than 2 | Art 24: not less than 1, not more than 9 | One director is lawful; Model Article 7(2) becomes available |
| Quorum | Art 26.1: 2 directors | Art 27.1: 1 director, unless there are 2 or more, then 2 including a Founder Director | A sole director is quorate |
| Conflicts | Art 27 (27.5, 27.7) | Art 28 (28.1(h) members' authorisation, 28.5, 28.7, 28.10) | The machinery is the same; the numbers moved |
| Votes | Not compared by this page | Ordinary and Vv shares vote; only Deferred Shares do not (Art 7.3) | Every class Tom holds votes |
| "Founder" | Tom King alone | "each of Ian Wolter and Tom King" | AR-006: the co-founder passage must be rephrased |
| Drag-along | 75% (Art 18.1, 18.13) | 55% (Art 19.1, 19.13) | AR-005: counsel to consider |
What on this map relied on the 2022 Articles
I searched this page for Art 23, 26.1, 27.5, 27.7, Model Article 11(3) and s.186. None of those references appears in the page text. Two statements on the page did rest on the superseded reading and are corrected and marked below; the sign-off plan (section 11) drops the second-director step. The instruments themselves still cite the 2022 numbers (finding AR-002), which this page reports but cannot change.
| Where | Reliance | Status |
|---|---|---|
| Map, section 9 callout (the audit corrected itself) | Reported SA-001 as a two-director requirement | Superseded: rewritten |
| Map, lane 10 Capacity | Described the capacity pack as a route needed because the board was inquorate | Superseded: fallback only |
| K-A27 (instrument) | Art 26 and 27 of the 26 Jan 2022 Articles; 27.5 and 27.7 for self-authorisation | Superseded: re-cite to 28.5, 28.7, 28.1(h), 28.10; 6 wrong |
| CC-MIN (instrument) | Assumes a plural board; cites no article number | Wording: recast as a sole-director record |
| W-LBA (instrument) | Art 26/27 cite; "Founder" passage | Superseded: 27/28; passage exposed (AR-006) |
| Reasoning: "Art 23 requires two directors" / "Art 26.1 quorum of two" | Behind SA-001, LN-109 and the original executive summary | Superseded (2023 Arts 24, 27.1) |
| Reasoning: Model Article 11(3) (a board below quorum may do only two things) and s.186 | Behind the second-director route | Superseded: neither is engaged when quorum is one |
| The review's text still carrying the old reading | SA-017, SA-023, LN-107 article references; 02-SCORECARD; 04-STRATEGY section 13.3; 04A Part A section 3.1; QUESTIONS-FOR-TOM; READING-ORDER; CRPD and K-A27 cover notes | Not rewritten: the correction file governs where they conflict |
What survives: s.175(6)(a) still means a sole interested director cannot authorise his own conflict, so K-A27 is a declaration, not an authorisation (SA-017 stands on that ground).
Findings from the correction
| ID | Severity | What it says |
|---|---|---|
| AR-001 | Medium | Wolter's right under Art 25.1(b) to reappoint himself after his 8 Feb 2024 resignation. A neutral watch item, not blocking |
| AR-002 | Medium | Every instrument citing the Articles uses the 2022 numbers; K-A27 names the wrong instrument outright. Blocking |
| AR-003 | Medium | No 2023 special resolution or new Articles on Companies House; the only 2023 resolutions are RES10 and RES11 filed 18 Sep 2023. Counsel |
| AR-004 | Medium | The April 2023 Articles changed the transfer rules governing the 20 Dec 2023 transfer of 2,013,753 shares to Wolter and Tom's intended purchase of Crowdcube investors' shares |
| AR-005 | Low | Drag-along fell from 75% to 55% |
| AR-006 | High | Challenge to D-272: the Articles define Founder as each of Wolter and King, so W-Q1 Q(e) and W-LBA's "four records are against that proposition" hand Wolter an answer. Blocks the Wolter pack; Tom agreed to rephrase |
Tom King's recorded answers (phase3/tom-answers.csv)
It carries about 45 third-party shareholders' data.
- Resolves LN-301 (critical) as a decision.
- Remove E-231 from the four Phase-1 RFIs (March, Raghunandan, Styles, Agyeman) and from W-EV section 8 (P1-007), and from any enclosure list.
- Tom must record a D-row; the review does not write to the matter.
Now a fact, recorded for the file.
- Any sentence in an instrument that implies a vote was launched must be corrected.
- Candidates from a keyword search (not yet confirmed as wrong): SH-UPD text lines 16 to 29 ("My interest in Vote 1", "before you vote") and line 129. CC-RRQ line 82 and CC-COV carry no such sentence.
- The review has not yet produced its own list of affected sentences. Tom needs to record a D-row or F-row.
One loop, from fact to signed instrument and back
What is strong and what is weak
- Content-hashed rungs did detect the three stale rungs.
- The receipt gate stops unreceipted writes on four row tools.
- Landing markers caught live defects, including a reversed decision set.
- Quotation verification passes 439 spans with no hard failures.
- Arithmetic in the Wolter letter (benchmark £5,281,184.04, Seninde £1,999,998, 345 days and others) recomputed consistently.
- The drift ledger is complete and the matter was never written to by the review.
- The machinery reports on itself, not on what will leave the building.
- Prose statements of readiness go stale when an instrument moves, and nothing re-cuts them.
- Two copies of one fact diverge and no guard compares them (yaml against receipt, status cell against text, the two stores).
- Deletions are invisible: rollback files, receipts and plan files have no "should exist" check.
- No single plan of record: plan-v5, the 14 September plan, PLAN-TO-SIGNOFF V2 and the handover list all claim to govern.
Proposed next structure
- Tom King adopts one plan of record, PLAN-TO-SIGNOFF V3, by a single D-row, built per pack against the seven readiness tests.
- Add the end-to-end dispatch check, the as-sent intake, a review-PDF re-render on every instrument edit, and instrument status for the DocuSign signing version.
- Make PG the only gate verdict; give the ladder real currency checks; extend landing markers to D-542 to D-693; retire duplicate controls.
- Hold the matter drafting-stage: foundation first, then drafting, then sign-off, as Tom King's own sequencing rule requires.
What this map is built from, and what it is not
- Review Project CLAUDE.md, PLAN, HANDOVER-PROMPT and the full LEDGER (4 to 5 October), re-read at commit c3955ae (6 October)
- Updated from:
01-FINDINGS.csv(computed),phase3/tom-answers.csv,phase3/CORRECTION-SA-001-2023-ARTICLES.md,phase3/ARTICLES-CROSSWALK-2022-v-2023.md,human-review/PUNCH-LIST.md,human-review/ARTICLES-RECITATION-INDEX.md,99-INTEGRITY.mdsections 8 and 9 05-FRAMEWORK-AND-SYSTEMSin full: rungs, the 67 checks, registers, rules, approval controls, plan and keep/retire list- The SUBAGENT-BRIEFING, the PUNCH-LIST header, the Wolter review pack README and the W-LBA sign-off page
- The advisor review's engine and process section (July snapshot)
- Tom King's saved litigation notes and working preferences
- The live matter store, the Lexi code and the LaCie were not accessed; nothing here was re-verified against them.
- The vault copies of the executive summary, integrity and coverage files are early skeletons, so figures for them come from the ledger.
- The store's CLAUDE.md, the earlier Codex drafting toolkit (retired with the generator pipeline) and individual instruments were not re-read.
- Counts and statuses are as at commit c3955ae and will have moved since. The ladder, gate and scorecard figures were not re-derived in this update.
- Not seen by the review or by me: the signed SeedLegals pack, the signed No-Benefit Deed, the Companies House filing, which April text was adopted, D-285, and the Calderbank expiry (13 Nov) beyond D-206(5). The register of members at adoption was not checked.
- The I2 sentence list is from a keyword search of three instruments, not a full read. I could not check any E-231 enclosure list for the redline either.